Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Note:  Some documents are password protected per NASA software release requirements.  For example, design documents related to current development can only be made public after formal release approval including export control.  These documents are marked with an "*".

Features, Teams, and Roles

 

Feature AreasTeamDescription of Planned FeaturesDocumentation and Plans
Event Location
  • JJKP
  •  WCS
  • YRL
  • JB
  • Shadow location
  • Ground station line-of-site location
  • Project Plan*: This document explains high level milestones, approach, and schedule.
  • Requirements*: These are working requirements.
  • Benchmark Report*: Report comparing available solutions.
  • Design Trades*: Discussion of high-level design trades.
  • Architectural Design Spec*: This document contains high level design.
  • Interface Field Spec*: Describes user interface elements including ranges, defaults, descriptions.
  • Component Level Specifications
Optimal Control
  • SPH
  • WCS
  • YKK
  • JC
  • EK

MATLAB Prototype Only. 

Scheduled for R2016a.

  • Radau Collocation
  • Multple Phase with Linkage costraints
  • Mesh refinement
  • Sparse finite differencing
  • Event Constraints
  • Path Constraints
  • Bolza Cost Function
  • SNOPT
  • Chemical, Electric, and Impulsive
Miscellaneous
  • TGG
  • RQ
  • LOJ
  • Basic GMAT Functions
  • WxWidgets
  • SNOPT
  • Python Interface
  • Flux File
  • Developer Docs
  • Sensor Parameters
 
 

High Level Documentation

...

Plans and Documentation

Ticket Tracking Dashboards

  • Agile Board:  This dashboard is used for CCB and prioritization of open tickets. 
  • Sprint Tracking Board:  This dashboard is used to plan and track work in the current Sprint.